Manufacturing Facility – Energy Audit & Decarbonisation
Demonstrated that meaningful emissions and cost reductions are achievable in energy-intensive manufacturing through targeted audits and practical decarbonisation planning
Quick Project Facts
Attribute
Details
📍 Location
Victoria, Australia
♻️ CO₂ Reduced
~280 tonnes CO₂-e/year
🔋 Fuel Offset
Reduced reliance on grid electricity
⚡ Energy Saved
~900 MWh/year
💰 ROI and cost savings
Estimated 13 months | $277,000 per year

Implementation Process
The facility operated continuous production lines with limited downtime, making it difficult to implement changes without affecting output. High peak demand events drove a disproportionate share of energy costs. Detailed interval data analysis was required to isolate demand drivers and identify optimisation opportunities without impacting manufacturing reliability.
Conclusion
The project delivered a clear strategy to reduce operating costs and emissions while supporting a transition away from gas, aligning energy performance with long-term sustainability goals.