We designed and installed a 60m³ anaerobic digester that now powers the entire milking and cold storage system.
Quick Project Facts
Attribute
Details
📍 Location
Sydney, Australia
♻️ CO₂ Reduced
~280 tonnes CO₂-e/year
🔋 Fuel Offset
Gas-to-electric opportunities identified
⚡ Energy Saved
~540 MWh/year
💰 ROI and cost savings
Estimated 13 months | $80,000 per year

Implementation Process
The facility operated continuous production lines with limited downtime, making it difficult to implement changes without affecting output. High peak demand events drove a disproportionate share of energy costs. Detailed interval data analysis was required to isolate demand drivers and identify optimisation opportunities without impacting manufacturing reliability.
Conclusion
The project delivered a clear strategy to reduce operating costs and emissions while supporting a transition away from gas, aligning energy performance with long-term sustainability goals.